Project at a glance.
- Customer
- Stevenson Aggregates
- Site
- Poplar Lane Quarry, Papamoa
- Scope
- Surge tunnel upgrade
- Tunnel length
- Approx. 50 metres
- Also included
- Gravity take-up tower
- Delivered by
- MIMICO Engineering and Service
Quarry Material Handling Upgrade
MIMICO delivered a complete surge tunnel upgrade project for Stevenson Aggregates at Poplar Lane Quarry in Papamoa. The new system was designed to improve material transfer efficiency and support reliable aggregate handling throughout the quarry operation.
The surge tunnels receive aggregate product directly from a stacking conveyor before vibrating feeder units transfer material onto the tunnel discharge conveyor for processing.
The project included approximately 50 metres of fabricated surge tunnel sections and manufactured by MIMICO’s Auckland Engineering team.
The modular system included multiple tunnel and feeder sections to suit the site layout and material handling requirements while allowing efficient transport and installation.
The project involved the removal of the existing surge tunnels and conveyor infrastructure before installation of the new system.
Key works completed included:
Installation was completed by MIMICO’s Material Processing Service and Engineering teams.
The completed upgrade provides Stevenson Aggregates with a modernised material handling system designed to improve operational reliability, maintain consistent material flow and support ongoing quarry production demands.
The modular tunnel design also improved installation efficiency and integration with the existing plant infrastructure.