MIMICO Engineering completed a full plant upgrade for Holcim at their Kiwi Point Quarry Site.

Plant Upgrade

This included manufacturing and supplying a new primary screen and refurbishing the existing Secondary El-Jay cone crusher plant. Completing the build was installing an existing Jaques Screen with new structure and associated chutes along with all transfer and product conveyors.

Project Highlights:

      • MIMCIO Engineering manufactured 3600×1500 x 3Deck Primary Screen.
      • All conveyors and guarding supplied to AS/NZS 4024 Standard.
      • 3D Design integrated into existing plant items.